Illinois State Library

Electronic Documents of Illinois



IDOT, State and Local Dignitaries to Cut Ribbon on IL 13 Connector Project

Publication Descriptor Page: IDOT, State and Local Dignitaries to Cut Ribbon on IL 13 Connector Project (2012, July 2) [727**12] - Electronic Documents of Illinois

Descriptor pages for multiple versions of a publication may be retrieved. Users should carefully check the version or date to match publications to their needs.

Document Identification

Title

IDOT, State and Local Dignitaries to Cut Ribbon on IL 13 Connector Project (2012, July 2) [727**12]

Access this Publication

Connect to the document

  1. IDOT, State and Local Dignitaries to Cut Ribbon on IL 13 Connector Project (070212IDOTIL13ribboncuttingadvisory.doc)

 

This document is one volume or edition of a serial (recurring) publication. Click here to access the entire series.

Description

The Illinois Department of Transportation (IDOT), state and local dignitaries will gather in a ribbon-cutting ceremony to announce the completion of the IL Route 13 improvement project, connecting the highway to US 45.

 

Issuing Agency

Illinois Information Service

Contact

Organization: Illinois Department of Transportation
2300 S. Dirksen Parkway
Springfield, IL 62764
 
Phone: 217-782-7820

Document Descriptive Information

File Data

  • Language(s): EN-English
  • Creation Date (from issuing agency): 07 02 2012
  • Document Modification Date (from issuing agency): 07 02 2012
  • Date Accepted Into Depository: Tue, 28 Aug 2012 16:10:02 UTC
  • Checksum Algorithm: MD5 SHA1
  • Document File Checksum:
    • 070212IDOTIL13ribboncuttingadvisory.doc - checksum='3079754288' byte count= '99328'