Illinois State Library

Electronic Documents of Illinois



IDOT Suspends Non-Emergency Road Work to Improve Traffic Flow for Independence Day

Publication Descriptor Page: IDOT Suspends Non-Emergency Road Work to Improve Traffic Flow for Independence Day (2012, July 2) [728**12] - Electronic Documents of Illinois

Descriptor pages for multiple versions of a publication may be retrieved. Users should carefully check the version or date to match publications to their needs.

Document Identification

Title

IDOT Suspends Non-Emergency Road Work to Improve Traffic Flow for Independence Day (2012, July 2) [728**12]

Access this Publication

Connect to the document

  1. IDOT Suspends Non-Emergency Road Work to Improve Traffic Flow for Independence Day (070212IDOTconstructionsuspensionrlsholiday.doc)

 

This document is one volume or edition of a serial (recurring) publication. Click here to access the entire series.

Description

With thousands of motorists expected to travel on state roadways during the 4th of July holiday, the Illinois Department of Transportation (IDOT) announced today that non-emergency road work will be suspended where possible to reduce congestion and improve traffic flow. IDOT also provided advance notice of lane closures that will be in place for the holiday weekend to aid motorists travel plans and boost safety.

 

Issuing Agency

Illinois Information Service

Contact

Organization: Illinois Department of Transportation
2300 S. Dirksen Parkway
Springfield, IL 62764
 
Phone: 217-782-7820

Document Descriptive Information

File Data

  • Language(s): EN-English
  • Creation Date (from issuing agency): 07 02 2012
  • Document Modification Date (from issuing agency): 07 02 2012
  • Date Accepted Into Depository: Tue, 28 Aug 2012 16:09:20 UTC
  • Checksum Algorithm: MD5 SHA1
  • Document File Checksum:
    • 070212IDOTconstructionsuspensionrlsholiday.doc - checksum='3127960829' byte count= '205824'