Descriptor pages for multiple versions of a publication may be retrieved. Users should carefully check the version or date to match publications to their needs.
Document Identification
Title
Quarterly Report 2: Dutchman Creek Watershed
Access this Publication
Connect to the document
- Quarterly Report 2: Dutchman Creek Watershed (dutchman-creek-2.pdf)
This document is one volume or edition of a serial (recurring) publication. Click here to access the entire series.
Sample text from the file
.DRAFT Page of Quarterly Report 2: Dutchman Creek Watershed Introduction This is second in series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser & McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed. Overview of Methodologies and Models Methodologies and models will be utilized to assess TMDL endpoints for the Dutchman Creek Watershed. Some physical settings, such as suspended solids in lake or stream, habitat alteration, or existence of noxious plants, do not lend themselves to typical water quality modeling. In these situations, where only limited or qualit
Contact
1021 N Grand Ave E
Document Descriptive Information
File Data
- Date Accepted Into Depository: Thu, 9 Aug 2012 14:36:23 UTC
- Checksum Algorithm: MD5 SHA1
- Document File Checksum:
- dutchman-creek-2.pdf - checksum='3849528583' byte count= '77771'
Other Descriptions Supplied by the Issuing Agency
- contactCity: Springfield
- contactOrganization: Illinois Environmental Protection Agency, Bureau of Water
- contactPhoneNumber: 217-782-3397
- contactState: IL
- contactZipCode: 62702
- dateCreated: 04 30 2002
- dateLastModified: 04 30 2002
- description: This is second in a series of quarterly reports to provide an update of Total Maximum Daily Load (TMDL) development in the Dutchman Creek Watershed. The Illinois Environmental Protection Agency (Illinois EPA) is responsible for TMDL development and has contracted with Camp Dresser & McKee (CDM) to complete TMDLs within this watershed. Illinois EPA plans to complete the TMDLs for this watershed within the next eight months. This quarterly report provides a brief description of how models and methodologies will be utilized in conducting TMDLs in the watershed.
- govType: State
- language: EN-English
- originatorDepartment: Environmental Protection Agency
- originatorDivision: Bureau of Water
- originatorJurisdiction: Illinois
- originatorOffice: Illinois
